1 of 4 condo units that needed roof replacement.
After tearing off old roofing material, we replaced the roof by spraying Polyurethane Foam
Bubbly, old roof that desperately needed to be re done.
A close up of the peel & stick paper that was put on top of bubbled foam roof.
During the process of tearing off old plywood deck.
Same roof after we have removed all material and rotted plywood deck. Here we have installed new plywood and have begun to primer it.
Finished Foam roof.
Another view of finished foam roof. We only did 2 units on a 4 unit building.
After repair was done (black area is where EPDM was applied to an old foam roof) the roof was power washed before manually applying Elastomeric Coating.
Completed repair. Coating was applied by hand; not a sprayer.
As we are starting to do Preventative Maintenance.
During the process of maintenance.
Maintenance complete.
A very deteriorated, old foam roof that was leaking.
During the process of scraping off old, blistered foam, so that we can do the repair.
Leak located, repair completed.
Before repair & maintenance.
After extensive maintenance and repair.
This is a 4 unit condo bldg. Here you can see a roof before maintenance (top left corner), 1 where only light maintenance was needed (bottom left corner) and then 1 with extensive repair and maintenance (top right corner). Other unit, nothing was done (bottom right corner).
Before maintenance and repair.
After (FYI- owner had been told by 3 different companies, that this roof needed to be replaced!)
Same roof one year after repair & maintenance was performed. NO leaks reported in the last year.
Before maintenance and repairs.
After maintenance and repair
EPDM was applied to this deteriorated foam roof to be able to repair it.
Coating applied; repair complete.
Small leak repair.
The completed project.